These detailed exhibits show the selected preferred alternative, the west bypass A4. For best results, right click the link, then choose "Save Link As" to save to your desktop.
This map shows the location of the study area.
This exhibit shows the results of the study conducted to determine the extentof east-west or north-south travel.
This exhibit shows the traffic counted during the peak hours.
This exhibit shows the average daily traffic growth over the last three decades.
This exhibit shows the intended project development schedule.
This exhibit shows the average daily traffic in 2030 if the project is not built.
This exhibit shows the existing and future land use in the project area.
This exhibit shows the preliminary range alternatives based on the input receivedfrom the first public meeting.
These exhibits show the various groups of possible alternategeometry configurations.
This form outlines the parameters by which all alternatives will be weighed againsteach other.
These exhibits show the potential roadway configuration via typical sections.
This matrix weighs the parameters from the 9 semifinalist alternativesagainst each other.
These exhibits show the conceptual developed alternategeometry configurations.
This exhibit shows the overall project environmental assessment area.This exhibit was updated for PM #2.
This exhibit shows the environmental resources within the Millburn BypassStudy Area. This exhibit was updated for PM #2.
This exhibit shows the 2005 – 2008 Segment and Intersection Crash Data.
This exhibit shows the final three alternatives for consideration.
These detailed exhibits show the final three alternatives for consideration.
This matrix weighs the parameters from the 3 finalist alternativesagainst each other.
This matrix weighs the parameters from the 9 semifinalist alternativesagainst each other. This matrix was updated with new information for PM #2.
These transportation flow models are showing existing and 2030 project traffic on afew of the potential alternatives.
These detailed exhibits show the selected preferred alternative, the west bypass A4.
This matrix weighs the parameters from the 3 finalist alternativesagainst each other. This matrix was updated with new information for CAG #5.